Baytown Shopping Center
Baytown: This retail shopping center space had been experiencing continuous leaks throughout for months. Both the tenant and the owner were frustrated by prior companies failure to address leaks despite numerous attempts. A complete photographic inspection report was provided to the owner showing the defects found. A proposal was made to perform repairs to defects and a complete silicone coating system to encompass the entire space.

Before Image
This roof was dirty! Defects found were failing seams with improper repairs, membrane degradation in areas, multiple punctures, dirt accumulation, and improper repairs.

Progress Image
Roof was cleared of all debris and powerwashed. What a difference! Repairs were made to defects in the roof and prior poor workmanship was rectified.

Completed Image
Repaired area was given a full silicone coating system that extended beyond the affected tenants space. This space is now entirely covered under a Roof Guard warranty.
Super 8 Motel
Super 8 Motel: This hotel had an aging shingle roof that was failing and also unattractive. The owner wanted to go back with a system that would perform for many years and would help his hotel stand out for travelers over the many other hotels in the area.

Before Image
This shingle roof was at the end of its life. Extensive repairs had been performed and would continue. The owner was provided a comprehensive photographic inspection report that made the choice clear to reroof rather than continue futile repairs.

Progress Image
Roof was completely torn off and repairs made as needed to the deck.

Completed Image
New standing seam roof was installed with minimal disruption to staff and guests.
Capital Advance
Capital Advance: Roof had significant damage due to storms. We were able to assess structural needs as well as roof system needs.

Before Image
Roof was inspected and necessary safety and structural needs for the client were established. Our thorough documentation assisted the owner to get maximum value through his insurance company for the roof replacement portion of his claim.

Progress Image
The existing roof was torn off and repairs made as needed to the deck. A high grade underlayment was installed and everything was made ready for the new custom panels to be installed.

Completed Image
The new standing seam roof will be watertight for many years to come and the effect on the properties curb appeal was dramatic.
Vet Clinic
Vet Clinic: This modified roof system was beginning to show signs of aging and was having more frequent leak issues come up. Owner wanted a solution that was affordable and would perform for many years to come. Options were provided for TPO and Silicone systems. Silicone was selected for its value and performance characteristics.

Before Image
Modified roof system was failing at the seams, improper repairs, and poor maintenance.

Progress Image
Roof was thoroughly powerwashed to remove dirt and granules then defect areas were repaired with modified materials. Bleed block primer was applied to promote adhesion and prevent yellowing. All flashing and seams were treated prior to silicone coating.

Completed Image
Silicone coating provides a seamless top coating for this building owner that carries a watertight 15 year material and labor warranty from the manufacturer.